# An insight into Maintenance Work Management

July 12, 2021*Pragma Academy Subject Matter Expert Tim Beavon*

I have been working in the asset and maintenance management fields my entire professional life. It has always astounded me that organisations continually appear to feel frustrated at their organisation’s inability to get the maintenance planning office “right”. In this article, I will endeavour to convince you that, in fact, the problem is a lot wider than Maintenance Planning and Scheduling – rather, it is a **Maintenance Work Management process** problem.

Perhaps some may see this as semantics – however, I am of the opinion it is the most likely root cause of the problem. We set our planners and schedulers up for failure and are then surprised when they fail – it is because we don’t get the Maintenance Work Management process correctly in place from the outset.

Maintenance Planning and Scheduling involves several role players that typically don’t consider the impact their actions or oversights have on their planners and schedulers. For this reason, we need to consider that this is a Maintenance Work Management problem and not just a Maintenance Planning and Scheduling problem.

> Maintenance Work Management
> Getting the right work done, at the right time, by the right resources in the right way.

### The principles of  maintenance planning and scheduling

In the Maintenance Planning Scheduling Handbook, Doc Palmer defined twelve principles of planning and scheduling that we often overlook in our enthusiasm and focus on the planner and scheduler’s activities. Doc Palmer’s principles need to be engraved on to the hearts of the reliability engineers, engineering managers, section engineers and maintenance supervisors across the industry. These are the principles that the planner and scheduler often have minimal control over but are fundamental to their success. Consider these factors:

### The importance of the weekly scheduling meeting

We know that the planner must focus on future work, and the maintenance supervisor must manage the current day or schedule. Think about how often the planner is distracted from the future work through interruptions and distractions that can and should be handled by the maintenance supervisor? Everything from the spare parts that haven’t arrived on time to the contractor who hasn’t completed the Covid-19 screening site access requirements become the planner’s problem, and it is all because the planner was the one who originally identified the need for the spare part or contractor. The purpose of the weekly scheduling meeting is to agree that the plan is realistic and practical and that the arrangements or logistics for the spare parts and contractors have been taken care of. **Once the maintenance supervisor is satisfied that everything is in order, they need to manage the agreed schedule for the week.** Many organisations’ processes don’t consider these factors, and often it is too easy to pull the planner into dealing with problems in this week’s schedule.

### The skills-set of an ideal planner

Do you promote your best tradespeople and supervisors to become planners? Planners should be the problem solvers in the plant, using their personal experience to get the right work done in the right way. It is that attitude toward quality and getting the job right that makes them so valuable. Developing tradespeople into the role of the planner makes that experience transferable across 20 tradespeople.

The planner must recognise the skills of the trade, while the scheduler must use the lowest required skill level. The planner is responsible for what must be done, and the maintenance supervisor must be responsible for how the work is done. Sounds simple. But, consider the impact that the reliability engineer, maintenance manager or section engineer has when defining the tasks that need to be executed. Reliability engineers have the luxury of looking at the asset type in isolation, using tools and techniques to define exactly what tactical maintenance needs to be carried out. What they don’t always do is give consideration to the apprentice trades in the organisation and what work an apprentice can do versus those tasks that a qualified trade can do. By discriminating between these skills requirements, we provide the planner and the scheduler with the flexibility to appropriately load the apprentices, freeing up valuable experienced trade capacity for precision work, rapid breakdown response or critical root cause analysis and solution development.

### Prioritising the most important work

Priorities are important, and the maintenance supervisor handles the current day. While the practice of making the planner responsible for the prioritisation of work is an important aspect of their role, it is equally important that the maintenance supervisor and the planner are aligned when it comes to deciding on the work priority. The maintenance supervisors are the go-to people that the operations supervisor will look to when problems arise in the plant.

Maintenance supervisor only prioritises work that absolutely needs to be done in this scheduling period to ensure that the tactical work is executed according to plan and as much work arising is managed by the planner. **When the work that could be planned is executed in the current schedule instead of the tactical maintenance, the reliability of the plant suffers.**

In summary, Maintenance Work Management is more than Maintenance Planning and Scheduling – let’s look at the bigger picture and see what roles outside of the maintenance planning and scheduling process are contributing towards the challenges we face in getting the right work done, at the right time, by the right resources in the right way.

##### Subscribe to our newsletter

##### Tags

Maintenance Planning and Scheduling
Maintenance Supervisor
Maintenance Work Management
Planner
Scheduler
Asset Management
Maintenance
Maintenance management

##### More content

##### AI in maintenance: from CMMS records to better decisions

Author | Henk Wynjeterp - Regional Lead – Europe

AI is giving maintenance teams new ways to extract, structure and interpret information. But the...

##### Asset Management Masterclass or Awareness Training? Start with the role, not the course

Author | Karen Greyling - Business Development Manager, Pragma

I get asked this question quite often: Should I do the Asset Management Masterclass, or...

##### The lonely learner problem: why self-paced learning still needs people

Author | Karen Greyling - Business Development Manager, Pragma

Self-paced learning has solved a very real problem for busy adults. It gives people more...

##### Pragma appoints Stephan Kornelius as Chief Executive Officer

Author | Pragma

Experienced Pragma executive takes the helm on 1 October as the business continues its next...

##### No time for training? Look at what is taking the time.

Author | Karen Greyling - Business Development Manager, Pragma

“Not now. The team is too busy.” It is one of the most understandable reasons...

##### When Finance and Operations agree on spares

Author | Pragma

MRO spares are often the source of a familiar business tension. Finance wants to reduce...

##### You don’t train for a marathon by running a marathon

Author | Tim Beavon - Partner Consultant, Pragma

Why shutdown readiness depends on applying lessons before the next major event A major shutdown...

##### Pragma announces leadership transition and continues strategic momentum

Author | Pragma

Pragma has announced an important leadership transition as the business continues to build on...

##### Are we solving the wrong training problem?

Author | Karen Greyling  - Academy Business Development Manager, Pragma

When organisations say they need training, they may already be solving the wrong training problem:...

##### The art of balancing work order feedback with compliance, learning, and wrench time

Author | Scheepers Schoeman - Senior Associate, Professional Services

Most organisations don’t choose their work order feedback culture. They drift into it. A new...

##### Why a qualified maintenance planner changes more than maintenance

Author | Karen Greyling - Academy Business Development Manager, Pragma

In many plants, the same pattern repeats itself. Work arrives late. Materials are chased at...

##### Why MRO inventory is different from other inventory classes

Author | Andre Jordaan - Partner Consultant, Pragma

MRO inventory differs from other inventory classes because demand is irregular, the consequences of stockouts...

##### How failing water infrastructure is quietly reshaping South Africa’s cities

Author | Nelson Broden – Business Lead Pragma Managed Services On the school run through...

##### From dead capital to operational certainty: Smarter spare parts management

Author: André Jordaan, Partner Consultant, Pragma Most MRO stores aren’t short of parts; they’re short...

##### Asset Management Awareness Training that fits real work

Author | Karen Greyling, Business Development Manager If you’ve ever thought, “We don’t need another...

##### Asset Management Masterclass: Strategic training for leaders driving performance, reliability and results

Author | Karen Greyling – Business Development Manager In asset-intensive industries, leaders are under growing...

##### Beyond compliance: Why repeated maturity assessments define asset performance leadership

Author | Stephan Kornelius – Pragma Professional Services Business Lead In asset-intensive industries, leaders face...

##### OEMs need a connected platform for services

Author | Henk Wynjeterp – Regional Lead – Europe | Henk leads Pragma’s OEM after-sales...

##### When rivers cry out: How asset management can help heal South Africa’s waterways

Author | Nelson Broden – Business Lead Pragma Managed Services The Hennops River, once part...

##### Ditch the buzzword: OEM after-sales leaders buy execution, not “servitization”

Author | Henk Wynjeterp – Regional Lead – Europe | Henk leads Pragma’s OEM after-sales...

##### Beyond the software – embedding your EAMS into your organisation’s DNA for sustainable value

The key to a successful EAMS (Enterprise Asset Management System) implementation lies in integrating the...

##### Pragma’s perspective on what the proposed South African budget means for infrastructure governance

Author | Stephan Kornelius

Author | Stephan Kornelius – Pragma Professional Services Business Lead Finance Minister Enoch Godongwana’s 2025...

##### Government infrastructure investments must go beyond bricks and mortar – A global perspective

Author | Bani Kgosana

Author | Bani Kgosana Across the globe, ageing infrastructure threatens economic stability. In the US,...

##### Pragma partners with Q36.5 Pro Cycling Team to power maintenance excellence

Author | Liza Schroeder Pragma is proud to announce its support of the Q36.5 Pro...

##### Revitalising South Africa – a better path to infrastructure renewal

Author | Bani Kgosana, Pragma CRO South Africa faces an extraordinary opportunity to transform its...

##### Transforming maintenance from a grudge purchase to a strategic investment

Author | Scott Gibson, Pragma CEO  With South Africans enjoying a break from load shedding...

##### Pragma 2.0 – CEO of Pragma, Scott Gibson’s vision is to compete with international giants through engineering excellence

At Pragma, our roots are deeply embedded in engineering consulting. We are proud to be...

##### Are you proactively shaping your focused improvement process or is it evolving organically?

Author | André Jordaan, Pragma Partner Consultant Focused improvement (FI) is the overarching process used...

##### Introducing Pragma’s Enhanced Asset Management Assessment Framework: AMIP

Physical assets must be managed effectively for a business to grow and be competitive. Across...

##### Unlocking Asset Management Excellence: Pragma’s Spotlight at the SAAMA Conference, 5-6 June 2024

As anticipation builds for the upcoming South African Asset Management Association (SAAMA) Conference, Pragma is...