---
title: "Combine Facilities & Asset Management to Save Millions"
description: "Julia Phala, Head of Sales and Client Relation Management Are you a manufacturing business struggling to contain the cost of production and upkeep of your"
image: https://www.pragmaworld.net/wp-content/uploads/article-image1.png
canonical: https://www.pragmaworld.net/increase-efficiency-and-save-millions-combine-your-facilities-and-asset-management-functions/
url: https://pragma-world.getmd.ai/increase-efficiency-and-save-millions-combine-your-facilities-and-asset-management-functions/.md
last_converted: 2026-10-28T13:07:32.020Z
---

# Combine Facilities & Asset Management to Save Millions

December 2, 2020*Julia Phala, Head of Sales and Client Relation Management*

Are you a manufacturing business struggling to contain the cost of production and upkeep of your physical assets such as buildings and equipment?

In challenging economic circumstances, such organisations are usually under pressure to save costs to meet bottom-lines.

Traditionally asset management and facilities management are managed separately, but a case can be made for combining these two functions. In this article, we delve deeper into the concept of an integrated facilities and asset management function to explore how you can affect savings to meet your bottom line by streamlining your business processes and improving operational efficiencies.

To ensure the availability of the facilities and assets required for production, medium to large organisations often depend on the facilities management and physical asset management divisions respectively. Often these services operate in parallel despite sharing similarities in scope and skills requirements.

In manufacturing, the asset management team are also referred to as plant maintenance. Irrespective of whether you process raw materials or produce fast-moving consumer goods, the success of your operation depends on **people**, **processes** and **technology** over and above the **facility** and its **assets**. To successfully execute the facilities and asset management functions, you need competent people to plan and execute work, guided by best practice processes and a system to coordinate the activities and manage information.

Figure 1: Interdependencies of facilities and assets management functions

Figure two shows the Work Planning and Control business process, the main steps involved are identifying, planning and executing work. The same process is followed by the facilities and asset management teams. For any maintenance tasks to be carried out in either of the functions, step 1 will be initiated – this is when an internal customer requests work to be done. For instance, a typical facilities management request could be for a faulty air-conditioner that has to be fixed, while a typical asset management request could be for a faulty production machine. The requests are routed to the facility manager or plant (maintenance) manager respectively, to include in their planning (step three) or, depending on urgency, for immediate execution (step six). Steps seven, eight and nine are then carried out to complete the workflow. In both requests, the maintenance business process followed is the same and ultimately serves the same end goal. Enabling **productivity to achieve company objectives**.

Figure 2: Work planning and control business process

Table one, below, provides a summary of the mutual measures and terminologies identified in a study by Julia Phala, Pragma’s Head of Sales and CRM, concluded in 2019.

| Terminology | Context |
| --- | --- |
| Efficiency | Commonly used in physical asset management referring to doing the right maintenance, on the right equipment and at the right time. |
| Productivity | Commonly used in facilities management referring to the rate at which output is achieved by ensuring the availability of facilities or required support functions. |
| Effectiveness | Refers to how well the effort results into reliability and availability e.g. extent to which planned activities are realized and planned results achieved. |
| Consistency | Refers to achieving the same quality of output by focusing on processes. |
| Compliance | To assure legal, statutory and regulatory requirements. |
| Customer/stakeholder satisfaction | Meeting customer or stakeholder demands without compromising the quality of service or safety are key to both functions. |
| Return on investment | Maximining value on capital investment through improved asset performance and output. |
| Enterprise Asset Management System (EAMS) also  known as Computerised     Maintenance Management System (CMMS) | A computerised system used to manage production equipment throughout their life cycle. |
| Computer-Aided Facilities Management System (CAFMS) also known as   Computerised Maintenance Management System (CMMS) | A computerised system used to manage facilities throughout their life cycle. |

Table 1: Common terminologies used in Facilities Management and Physical Asset Management

The study revealed the inefficiencies of having the facilities and asset management (FM and AM) divisions operate in parallel and historical perceptions that influenced these functions negatively. Instead of appreciating these functions as strategic, value-adding teams, they are often seen as ‘costs to be contained’ or ‘the necessary evil’. This approach has led to an increased cost of operations due to misaligned objectives. Some of the observable inefficiencies in operating FM and AM separately are excessive overheads in staff salaries, costly supplies, use of multiple software or contractors for work with similar scope, and inefficient processes due to a lack of alignment between the divisions. Below are two examples.

#### Example 1: Disjoined business processes

For the first example, we look at a manufacturing company, with 1000 staff members. As described above, this manufacturing concern’s FM and AM functions operate in parallel as two separate teams. Table two below demonstrates the scope of the functions.

| Facilities management maintenance scope | Asset management maintenance scope |
| --- | --- |
| Site maintenance i.e. landscaping, road, fence, parking lot | Maintenance of production equipment within safety yellow lines and related tools, requiring mechanical and electrical technicians and artisans. |
| Structural maintenance i.e. overhead doors, cranes, roofing system, elevators etc |  |
| Architectural maintenance i.e. painting, refurbishment etc |  |
| Mechanical maintenance i.e. HVAC, plumbing, fire protection etc |  |
| Electrical maintenance i.e. low, medium and high voltage, fire alarm, lighting, UPS) |  |

Table 2: Scope for Facilities Management and Asset Management

In this example, the elevator, that gives access to the production plant and overhead crane falls under the facilities manager’s portfolio. On the other hand, everything within the plant’s safety yellow line falls under the plant manager’s portfolio. Both parties have a common goal; ensuring asset and facilities uptime in support of production. Although these teams share a common goal, their business processes are disjointed and do not inform each other.

The plant manager follows a preventive maintenance plan and schedules maintenance work, estimated at three hours, on a particular production line. Unknowingly, the facilities manager, who also follows a preventative plan, schedules maintenance work on the elevator and overheard crane making both unavailable to the plant maintenance team.

As a result of the disjointed business processes, the maintenance scheduled on the production line now takes from three days to three weeks to complete with dire consequences on production. Let us use a hypothetical example to illustrate the point. Translating this to Rands, and assuming the cost of downtime to be R 404 360 per minute (an industry average for automotive) the loss would equate to R 24 261 600,00 per hour, or R 582 278 400,00 per 24-hour shift. This does not account for unproductive staff labour during the period.

#### Example 2: Making the most of skilled recourses

As can be seen in table two, FM and AM both need mechanical and electrical engineering skills to fulfil their scopes. Let us take a look at the cost savings that could be realised when these resources are shared amongst the FM and AM teams as opposed to each team appointing its own resources.

We’re assuming that the facilities management division has two mechanical technicians, two electrical technicians and ten tradespeople collectively; and the asset management has two mechanical technicians, two electrical technicians and ten tradespeople. At average rates of R 150 per hour for technicians and R 80 per hour for artisans, the salary bill would cost R 5 376 000.00 per annum combined. If the functions are integrated at strategic and tactical levels, where planning for all maintenance are handled by one technician in the respective disciplines (ie all functions for both facilities and assets are planned by one mechanical technician or planner and one electrical technician or planner), the salary bill is already cut by R 1 152 000.00 per annum.

Other cost savings could come from combining the functions of the operational team. For example, instead of 20 tradespeople, employ ten to serve both disciplines. In this instance, five tradespeople each are allocated to the mechanical and electrical work respectively resulting in a further saving of R 1 536 000.00 per annum. When following this strategy, staff retention and change management are critical and requires a mental shift by both divisions.

The study also revealed that business leaders have an appetite for the integration of FM and AM. Businesses, especially in manufacturing, have plenty to gain from the integration of FM and AM. Some immediate bottom-line value adds, can be gained mainly by:

- Streamlining of processes, such as Asset Register Administration, Work Planning and Control, Spares Management, and Contract Management.

- Software optimisation (EAMS/CMMS) through the use of a single system, as opposed to multiple software systems.

- Upskilling and sharing of human resources, where the appointment of maintenance resources is per engineering discipline and equipment class (criticality A, B, C) across FM and AM function.

- Sharing skilled resources, instead of each division appointing its own contractors, contractors can be shared.

Figure 3: Responses obtained at SAAMA 2019 conference

As illustrated in the examples above, a siloed approach to Asset and Facilities management is a costly exercise. For the proposed improvement to work, a central coordination function at a strategic level is required. Figure four visually represents the concept of a leaner, combined FM and AM Division.

A streamlined business process can result in significant cost-savings and, when automated, can eliminate waste. After all, facilities management and asset management functions are concerned with maximising return on investment by ensuring productivity, compliance and stakeholder satisfaction.

Figure 4: Proposed Facilities and Assets Management Structure

#### Sources:

1. “Integrating physical asset management and facilities management operation and its benefits to the manufacturing industries”, Phala J (2019)

2. “Work Planning and Control”, Pragma (2019)

3. “Understanding the Financial Cost of Downtime in Manufacturing”, Daisyme P (2018)

##### Subscribe to our newsletter

##### Tags

Asset Managemen
Bottomline
Buildings
Business Processes
Cost of Production
Facility
Integration
Julia Phala
Operational Efficiences
Processess
Productivity
Savings
Assets
Equipment
Facilities Management
Maintenance
Manufacturing
People
Physical Asset Management
Technology
Work Planning and Control

##### More content

##### You can’t digitise chaos: Building a smarter campus

Author | Tertius Janse van Rensburg - Strategic Solutions Executive, Pragma

A smart campus sounds like a technology project. In practice, it is an operating maturity...

##### Enterprise asset management begins with better decisions

Author | Marco Aberkrom - Asset Management Consultant

Asset management is the way organisations connect long-term objectives with decisions about the performance, risk...

##### AI in maintenance: from CMMS records to better decisions

Author | Henk Wynjeterp - Regional Lead – Europe

AI is giving maintenance teams new ways to extract, structure and interpret information. But the...

##### Asset Management Masterclass or Awareness Training? Start with the role, not the course

Author | Karen Greyling - Business Development Manager, Pragma

I get asked this question quite often: Should I do the Asset Management Masterclass, or...

##### The lonely learner problem: why self-paced learning still needs people

Author | Karen Greyling - Business Development Manager, Pragma

Self-paced learning has solved a very real problem for busy adults. It gives people more...

##### Pragma appoints Stephan Kornelius as Chief Executive Officer

Author | Pragma

Experienced Pragma executive takes the helm on 1 October as the business continues its next...

##### No time for training? Look at what is taking the time.

Author | Karen Greyling - Business Development Manager, Pragma

“Not now. The team is too busy.” It is one of the most understandable reasons...

##### When Finance and Operations agree on spares

Author | Pragma

MRO spares are often the source of a familiar business tension. Finance wants to reduce...

##### You don’t train for a marathon by running a marathon

Author | Tim Beavon - Partner Consultant, Pragma

Why shutdown readiness depends on applying lessons before the next major event A major shutdown...

##### Pragma announces leadership transition and continues strategic momentum

Author | Pragma

Pragma has announced an important leadership transition as the business continues to build on...

##### Are we solving the wrong training problem?

Author | Karen Greyling  - Academy Business Development Manager, Pragma

When organisations say they need training, they may already be solving the wrong training problem:...

##### The art of balancing work order feedback with compliance, learning, and wrench time

Author | Scheepers Schoeman - Senior Associate, Professional Services

Most organisations don’t choose their work order feedback culture. They drift into it. A new...

##### Why a qualified maintenance planner changes more than maintenance

Author | Karen Greyling - Academy Business Development Manager, Pragma

In many plants, the same pattern repeats itself. Work arrives late. Materials are chased at...

##### Why MRO inventory is different from other inventory classes

Author | Andre Jordaan - Partner Consultant, Pragma

MRO inventory differs from other inventory classes because demand is irregular, the consequences of stockouts...

##### How failing water infrastructure is quietly reshaping South Africa’s cities

Author | Nelson Broden – Business Lead Pragma Managed Services On the school run through...

##### From dead capital to operational certainty: Smarter spare parts management

Author: André Jordaan, Partner Consultant, Pragma Most MRO stores aren’t short of parts; they’re short...

##### Asset Management Awareness Training that fits real work

Author | Karen Greyling, Business Development Manager If you’ve ever thought, “We don’t need another...

##### Asset Management Masterclass: Strategic training for leaders driving performance, reliability and results

Author | Karen Greyling – Business Development Manager In asset-intensive industries, leaders are under growing...

##### Beyond compliance: Why repeated maturity assessments define asset performance leadership

Author | Stephan Kornelius – Pragma Professional Services Business Lead In asset-intensive industries, leaders face...

##### OEMs need a connected platform for services

Author | Henk Wynjeterp – Regional Lead – Europe | Henk leads Pragma’s OEM after-sales...

##### When rivers cry out: How asset management can help heal South Africa’s waterways

Author | Nelson Broden – Business Lead Pragma Managed Services The Hennops River, once part...

##### Ditch the buzzword: OEM after-sales leaders buy execution, not “servitization”

Author | Henk Wynjeterp – Regional Lead – Europe | Henk leads Pragma’s OEM after-sales...

##### Beyond the software – embedding your EAMS into your organisation’s DNA for sustainable value

The key to a successful EAMS (Enterprise Asset Management System) implementation lies in integrating the...

##### Pragma’s perspective on what the proposed South African budget means for infrastructure governance

Author | Stephan Kornelius

Author | Stephan Kornelius – Pragma Professional Services Business Lead Finance Minister Enoch Godongwana’s 2025...

##### Government infrastructure investments must go beyond bricks and mortar – A global perspective

Author | Bani Kgosana

Author | Bani Kgosana Across the globe, ageing infrastructure threatens economic stability. In the US,...

##### Pragma partners with Q36.5 Pro Cycling Team to power maintenance excellence

Author | Liza Schroeder Pragma is proud to announce its support of the Q36.5 Pro...

##### Revitalising South Africa – a better path to infrastructure renewal

Author | Bani Kgosana, Pragma CRO South Africa faces an extraordinary opportunity to transform its...

##### Transforming maintenance from a grudge purchase to a strategic investment

Author | Scott Gibson, Pragma CEO  With South Africans enjoying a break from load shedding...

##### Pragma 2.0 – CEO of Pragma, Scott Gibson’s vision is to compete with international giants through engineering excellence

At Pragma, our roots are deeply embedded in engineering consulting. We are proud to be...

##### Are you proactively shaping your focused improvement process or is it evolving organically?

Author | André Jordaan, Pragma Partner Consultant Focused improvement (FI) is the overarching process used...