---
title: "Is your power backup investment failsafe when Eskom load shedding strikes?"
description: "Wave after wave of load shedding has hit the country, as you would have experienced, no doubt. This has resulted in incidents where service providers and"
image: https://www.pragmaworld.net/wp-content/uploads/Generator_200220.jpg
canonical: https://www.pragmaworld.net/is-your-power-backup-investment-failsafe-when-eskom-load-shedding-strikes/
url: https://pragma-world.getmd.ai/is-your-power-backup-investment-failsafe-when-eskom-load-shedding-strikes/.md
last_converted: 2026-10-07T16:52:33.128Z
---

# Is your power backup investment failsafe when Eskom load shedding strikes?

November 17, 2021
Planning the shutdownWave after wave of load shedding has hit the country, as you would have experienced, no doubt. This has resulted in incidents where service providers and businesses in all industries have been unable to operate at full capacity. Initially, when all of this started in 2020, we ourselves suffered a generator failure at our head office, at a highly inconvenient time. These events prompted us to have a critical look and think about what should be in place to ensure a reliable backup when the inevitable will occur. After all, even backup plans need maintenance.

In this article, we offer some advice on how you can secure the reliability of your backup power. Further down we also introduce you to an Asset Performance Management solution that we developed that has now been thoroughly tried and tested (thanks to the recurring power outages) and delivers real peace of mind.

### Understanding your risk. What is the impact on your business when a specific critical asset fails?

Before you lift a finger or grab a meter, it is important to get a little (but good) understanding of the real-life situation. In any case where you want to ensure predictable, reliable operation of a thing (be it a machine, computer, or even a human) you should do a risk assessment to know:

- What are the critical functions you expect from the thing?

- What is the critical component that will affect this function?

- How likely is that component of the thing to fail?

In this case, the “thing” under discussion is a standby electrical power generator set, aka genset. For such a genset, the answers to these questions are quite simple and illustrated in the figure below.

| Function | Components | Failure likelihood |
| --- | --- | --- |
| Detect primary AC failure | Voltage sensor; actuated switch | Low |
| Start the engine | Battery, starter motor, engine ignition, fuel | High |
| Run engine for 2 hours | Engine, cooling, lubrication, fuel supply | Medium |
| Generate electrical AC | Alternator, regulator | Low |
| Switch supply connections | Transfer switch | Low |

Illustrated generator

### Maintenance best practices for a genset

To ensure good reliability and effective delivery of standby power from your diesel or petrol-powered genset, here are some useful simple tips to bear in mind when caring for such an asset:

1. Ensure that all fluids in the machine are kept at the correct levels:

- Coolant level is between minimum and maximum on the level indicator

- Oil level is between minimum and maximum on dipstick or sight glass (do NOT overfill)

- The fuel level is between 75% and 100% of tank capacity. This reduces the possibility of condensation absorption into fuel, as well as the risk of premature depletion

2. It is vital that the batteries, used to start the generator engine, are always fully charged. This is ideally confirmed by measuring the voltage of the disconnected battery to be > 12.6 VDC (for each 12V unit). Furthermore, battery electrolytes, for maintainable units, should always be at the correct levels in each cell of the battery set. For sealed maintenance free (SMF) units, the visual indicator should be (positive) green.

3. Ensure that the AC mains power failure detection system as well as the automatic transfer switching (ATS) system is functional and is switched into the AUTO RUN or equivalent mode at all times.

4. For gensets that switch on and transfer power automatically, and especially larger sets (100 KVA and more), it is essential to keep the engine oil and coolant at an elevated temperature, typically above 45°C. This ensures the immediate loading capability of the generator, without having to wait a few minutes for engine warm-up.

5. Do regular visual inspection to ensure that all cooling system air ducts, inlet filters, radiators and extraction fans are clear of dust and debris. Air filter units should be regularly checked for blockages (check filter air block detectors where used).

6. Do regular visual inspection for signs of fluid leaks or seepage. If any are found, ensure that rectification is promptly done, before leaks become excessive.

7. Ensure adequate fuel reserves immediately available and fuel refilling is easily possible without spillage. Consider day tanks, hoses, filler fittings, transfer pumps, spare fuel drums, drum trolleys).

8. During testing, ensure that when the engine is started up, it is not run longer than 10 minutes without load. If started up, it is preferable that the engine is run with a load, for a minimum of 30 minutes, observing temperatures, pressures, cooling and signs of fluid leaks. It is essential that a genset gets regular exercise.

9. In the longer term:

- Simulate AC Mains failures at recommended intervals and ensure that the Mains/Generator/Mains switch-over cycles fully complete their functions.

- During simulated AC Mains failure tests, ensure that the engine starts immediately and smoothly takes up the load, while observing for signs of labouring due to possible overloading (excessive diesel smoke, under voltage, machine not achieving rated engine speed).

- It is a good practice to have the generator serviced annually, or every 200 operating hours, by a reputable competent specialist service provider.

- Plan and budget to pro-actively replace battery packs every two to three years, depending on the climatic conditions/exposure to high ambient temperatures.

10. From a generator sizing and design point of view, ensure that the genset is not electrically overloaded during start-up and continuous running. Review the load configuration regularly to further ensure that load circuits have not crept up, and that phase balancing is maintained.

Lastly, but possibly the most important aspect to have assurance of asset reliability, is the disciplined adherence to your adopted maintenance and asset care programs. This often has to fend against operational and political pressure, but should never be compromised. Good mechanisms to support this, are clear service level agreements and computerised maintenance management systems.

### Pragma’s Asset Performance Management solution for commercial generators

After experiencing the effect of a generator failing when it should have rescued our operation during a power outage, we tasked a team to design and develop a maintenance solution that would give us 24/7 generator reliability and availability.  This proved so effective that we packaged it and now offer an Asset Performance Management solution on generators.

In a nutshell, the solution consists of a carefully selected technology stack to help monitor and predict potential failures, preventive maintenance plans and a set of reactive work management procedures.  All of this is underpinned by digitalised workflow using work management applications and our On Key EAM system. A client’s EAM or CMMS can also be used.  Furthermore, the monitoring solution is offered with a service option where our contractors will perform the planned maintenance or warning induced reactive work, or a client can opt to use their own staff to do this work.

We now enjoy an uninterrupted power supply and don’t have to worry about the dreaded load shedding schedule. So can you.  Read more about the Asset Health Management solution here or speak to one of our Solutions Specialists to help you set up an affordable and reliable backup plan for power outages.

##### Subscribe to our newsletter

##### Tags

Asset Health Management
Commercial generator
Generator cooling system
Generator fuel level
Generator reliability
Power failure detection system
generator maintenance
genset
load shedding
Main Switch
Power
power failure

##### More content

##### AI in maintenance: from CMMS records to better decisions

Author | Henk Wynjeterp - Regional Lead – Europe

AI is giving maintenance teams new ways to extract, structure and interpret information. But the...

##### Asset Management Masterclass or Awareness Training? Start with the role, not the course

Author | Karen Greyling - Business Development Manager, Pragma

I get asked this question quite often: Should I do the Asset Management Masterclass, or...

##### The lonely learner problem: why self-paced learning still needs people

Author | Karen Greyling - Business Development Manager, Pragma

Self-paced learning has solved a very real problem for busy adults. It gives people more...

##### Pragma appoints Stephan Kornelius as Chief Executive Officer

Author | Pragma

Experienced Pragma executive takes the helm on 1 October as the business continues its next...

##### No time for training? Look at what is taking the time.

Author | Karen Greyling - Business Development Manager, Pragma

“Not now. The team is too busy.” It is one of the most understandable reasons...

##### When Finance and Operations agree on spares

Author | Pragma

MRO spares are often the source of a familiar business tension. Finance wants to reduce...

##### You don’t train for a marathon by running a marathon

Author | Tim Beavon - Partner Consultant, Pragma

Why shutdown readiness depends on applying lessons before the next major event A major shutdown...

##### Pragma announces leadership transition and continues strategic momentum

Author | Pragma

Pragma has announced an important leadership transition as the business continues to build on...

##### Are we solving the wrong training problem?

Author | Karen Greyling  - Academy Business Development Manager, Pragma

When organisations say they need training, they may already be solving the wrong training problem:...

##### The art of balancing work order feedback with compliance, learning, and wrench time

Author | Scheepers Schoeman - Senior Associate, Professional Services

Most organisations don’t choose their work order feedback culture. They drift into it. A new...

##### Why a qualified maintenance planner changes more than maintenance

Author | Karen Greyling - Academy Business Development Manager, Pragma

In many plants, the same pattern repeats itself. Work arrives late. Materials are chased at...

##### Why MRO inventory is different from other inventory classes

Author | Andre Jordaan - Partner Consultant, Pragma

MRO inventory differs from other inventory classes because demand is irregular, the consequences of stockouts...

##### How failing water infrastructure is quietly reshaping South Africa’s cities

Author | Nelson Broden – Business Lead Pragma Managed Services On the school run through...

##### From dead capital to operational certainty: Smarter spare parts management

Author: André Jordaan, Partner Consultant, Pragma Most MRO stores aren’t short of parts; they’re short...

##### Asset Management Awareness Training that fits real work

Author | Karen Greyling, Business Development Manager If you’ve ever thought, “We don’t need another...

##### Asset Management Masterclass: Strategic training for leaders driving performance, reliability and results

Author | Karen Greyling – Business Development Manager In asset-intensive industries, leaders are under growing...

##### Beyond compliance: Why repeated maturity assessments define asset performance leadership

Author | Stephan Kornelius – Pragma Professional Services Business Lead In asset-intensive industries, leaders face...

##### OEMs need a connected platform for services

Author | Henk Wynjeterp – Regional Lead – Europe | Henk leads Pragma’s OEM after-sales...

##### When rivers cry out: How asset management can help heal South Africa’s waterways

Author | Nelson Broden – Business Lead Pragma Managed Services The Hennops River, once part...

##### Ditch the buzzword: OEM after-sales leaders buy execution, not “servitization”

Author | Henk Wynjeterp – Regional Lead – Europe | Henk leads Pragma’s OEM after-sales...

##### Beyond the software – embedding your EAMS into your organisation’s DNA for sustainable value

The key to a successful EAMS (Enterprise Asset Management System) implementation lies in integrating the...

##### Pragma’s perspective on what the proposed South African budget means for infrastructure governance

Author | Stephan Kornelius

Author | Stephan Kornelius – Pragma Professional Services Business Lead Finance Minister Enoch Godongwana’s 2025...

##### Government infrastructure investments must go beyond bricks and mortar – A global perspective

Author | Bani Kgosana

Author | Bani Kgosana Across the globe, ageing infrastructure threatens economic stability. In the US,...

##### Pragma partners with Q36.5 Pro Cycling Team to power maintenance excellence

Author | Liza Schroeder Pragma is proud to announce its support of the Q36.5 Pro...

##### Revitalising South Africa – a better path to infrastructure renewal

Author | Bani Kgosana, Pragma CRO South Africa faces an extraordinary opportunity to transform its...

##### Transforming maintenance from a grudge purchase to a strategic investment

Author | Scott Gibson, Pragma CEO  With South Africans enjoying a break from load shedding...

##### Pragma 2.0 – CEO of Pragma, Scott Gibson’s vision is to compete with international giants through engineering excellence

At Pragma, our roots are deeply embedded in engineering consulting. We are proud to be...

##### Are you proactively shaping your focused improvement process or is it evolving organically?

Author | André Jordaan, Pragma Partner Consultant Focused improvement (FI) is the overarching process used...

##### Introducing Pragma’s Enhanced Asset Management Assessment Framework: AMIP

Physical assets must be managed effectively for a business to grow and be competitive. Across...

##### Unlocking Asset Management Excellence: Pragma’s Spotlight at the SAAMA Conference, 5-6 June 2024

As anticipation builds for the upcoming South African Asset Management Association (SAAMA) Conference, Pragma is...