title: "MV Power System Condition Assessment"
description: "Replacing feeder cables and terminations under Pragma's quality assurance process ensures a properly tested, reliable MV power system installation."
image: https://www.pragmaworld.net/wp-content/uploads/resources.jpg
canonical: https://www.pragmaworld.net/resource/case-study-line-condition-assessment-findings-mv-power-system-drupps/
url: https://pragma-world.getmd.ai/resource/case-study-line-condition-assessment-findings-mv-power-system-drupps/.md
last_converted: 2026-10-06T18:04:53.901Z
---

# Case Study | On-line condition Assessment Findings of MV Power System (DRUPPS)

May 2, 2018Replacement of the feeder cables and terminations under the Pragma quality assurance processes will ensure that the installation, offline test and online assessment standards are met and will avoid incorrect replacement that can be costly.

Download case study

##### More content

##### Case Study | Oil and Gas | Fuel Retail Digital Transformation

The maintenance management of the Shell fuel retail network is managed via an end-to-end digitally...

Find out more

##### Case Study | Mining | Coal | LG Cyclone Feed Pipe

Coal mining operations mine and deliver coal from open cast pit to a crushing circuit....

Find out more

##### Case Study | Manufacturing Glass | Nampak Glass | FI on IS Machine Maintenance Strategy

This project forms an integral part of the bigger asset management process by highlighting specific...

Find out more

##### Reference story | Fast foods | Increase statutory SLA’s

Since the implementation of the initiative, the statutory SLA for work orders completed increased from...

Find out more

##### Client Reference | Manufacturing | Automotive | On Key Work Planning & Control on SAP® PM

On Key allows us to plan, schedule and allocate tasks to our artisans based on...

Find out more

##### Case Study | Distributed Facilities | Office Management | Curo Fund Services | Contractor Management and Work Processes

This is how we reduced our client’s printing paper usage by 25% and reduced their...

Find out more

##### Coal | TH 1 efficiency

The combined effort of our maintenance team, with the facilitation of problem solving led by...

Find out more

##### Proof of Concept | Facilities Management | Smart Building project

We challenged our R&D and FM teams to come up with an intelligent FM solution...

Find out more

##### Client Reference | Mining | Coal | Compliance Dashboard

Our client consists of 4 mid-size coal mines, covering underground, opencast, beneficiation plant as well...

Find out more

##### Case Study | Local Government | Department of Health Western Cape | Asset Care Service

The Department of Health Western Cape had, as part of their Hospital Revitalisation Program, identified...

Find out more