# Case Study | Manufacturing Glass | Nampak Glass | FI on IS Machine Maintenance Strategy

November 22, 2017This project forms an integral part of the bigger asset management process by highlighting specific focus areas for immediate improvement.

Download case study

##### More content

##### Diamonds | Cascade conveyors

Cost savings from elimination of root causes of incorrect cascade positioning failure are calculated to...

Find out more

##### Case Study | Formex | Manufacturing | Automotive

The results of the air leak survey has triggered an energy management drive within the...

Find out more

##### Referentie | OEM-verpakkingsindustrie | Optimalisatie reserveonderdelen met een SAP- en On Key-gebruikersinterface

Complexe interfaces tussen softwaresystemen zijn verwijderd, waardoor het beheer van grote aantallen (reserve) onderdelen voor...

Find out more

##### Case Study | Oil and Gas Retail | FMC Digitalisation Process Flow

Shell is a national supplier of petroleum products and have a proud record of presenting...

Find out more

##### Client Reference | Manufacturing | Automotive | Integrating the Pragma Way

The client gained improved asset management maturity with individuals taking ownership and accountability for completing...

Find out more

##### Case Study | Distributed Facilities | Office Management | Curo Fund Services | Contractor Management and Work Processes

This is how we reduced our client’s printing paper usage by 25% and reduced their...

Find out more

##### Case Study | Local Government | City of Cape Town | Electrical Support Services | Substation Maintenance

The Electrical Support Services (ESS) department is responsible for transformer and switchgear installation and refurbishment,...

Find out more

##### Client Reference | Mining and Minerals | Platinum | Reliability Block Diagrams

The client has the opportunity to test various scenarios concerning maintenance interventions, allowing them to...

Find out more

##### Reference story | Fast Foods | Increase in statutory SLA of tactical WO’s

Since the implementation of the initiative, the statutory SLA for work orders completed increased from...

Find out more

##### Client Reference | Manufacturing | Automotive | Implementing On Key to Improve Work Planning and Control

On Key is a cost saver because it allows us to become completely paperless and...