---
title: "Case Study"
description: "The primary crusher blocked on oversize material and suffered a breakdown that delayed production for over 24hrs. Engineers reviewed and intensified the"
image: https://www.pragmaworld.net/wp-content/uploads/resources.jpg
canonical: https://www.pragmaworld.net/resource/case-study-mining-coal-primary-crusher-tip-bin-blockage/
url: https://pragma-world.getmd.ai/resource/case-study-mining-coal-primary-crusher-tip-bin-blockage/.md
last_converted: 2026-10-07T19:24:08.629Z
---

# Case Study | Mining | Coal | Primary Crusher Tip Bin Blockage

April 14, 2020The primary crusher blocked on oversize material and suffered a breakdown that delayed production for over 24hrs. Engineers reviewed and intensified the maintenance strategy for the crusher based the crushing rate and workload.

Download case study

##### More content

##### Referentie | OEM-verpakkingsindustrie | Optimalisatie reserveonderdelen met een SAP- en On Key-gebruikersinterface

Complexe interfaces tussen softwaresystemen zijn verwijderd, waardoor het beheer van grote aantallen (reserve) onderdelen voor...

Find out more

##### Case Study | Oil and Gas Retail | Shell | Follow Up Work Orders | On Key

Convenient to electronically capture which assets need repairs while on site and peace of mind...

Find out more

##### Municipality | Sub-station maintenance

The ACC provided a platform for the staff at ESS to be able to easily...

Find out more

##### Case Study | Oil and Gas Retail | FMC Digitalisation Process Flow

Shell is a national supplier of petroleum products and have a proud record of presenting...

Find out more

##### Case Study | Mining | Coal | CNV 202 Take up Track Wheel Failure

Coal mining operations mine and deliver coal from open cast pit to a crushing circuit....

Find out more

##### Case Study | On-line condition Assessment Findings of MV Power System (DRUPPS)

Replacement of the feeder cables and terminations under the Pragma quality assurance processes will ensure...

Find out more

##### Case Study | Oil and Gas | Fuel Retail Digital Transformation

The maintenance management of the Shell fuel retail network is managed via an end-to-end digitally...

Find out more

##### Client Reference | Distributed Facilities | Retail | SLA driven performance

Our client is a large supermarket retailer in Africa, operating over 2,500 outlets under 15...

Find out more

##### Mining | Planning and Scheduling

Introducing the On Key planning and scheduling tool highlighted the amount of unnecessary Work Orders,...

Find out more

##### Client Reference | Mining | Coal | Customisation of Asset Tactics Navigation

Our client has a coal open cast mine, with one DMS plant for the beneficiation...

Find out more