---
title: "Case Study"
description: "The Distribution Directorate is responsible for the maintenance of and extensions to the distribution network, which includes overhead lines, substations,"
image: https://www.pragmaworld.net/wp-content/uploads/resources.jpg
canonical: https://www.pragmaworld.net/resource/case-study-nelson-mandela-bay-electricity/
url: https://pragma-world.getmd.ai/resource/case-study-nelson-mandela-bay-electricity/.md
last_converted: 2026-10-07T18:23:49.871Z
---

# Case Study | Local Government | Municipality | Nelson Mandela Bay | AIV |  AMIP | ACC

May 12, 2020The Distribution Directorate is responsible for the maintenance of and extensions to the distribution network, which includes overhead lines, substations, underground cable networks, street and high mast lighting, gas turbines.

Download case study

##### More content

##### Client Reference | OEM | Packaging | 3PE | Rapid Response | On Key

It was a big help to get all the maintenance recommendations from the different equipment...

Find out more

##### Case Study | Oil and Gas Retail | Shell | Critical Inspection Animated Training

The CEI clarification animations have become a Practice Worth Replicating in other markets and were...

Find out more

##### Case Study | Local Government | Municipality | COCT | Corrosion Maintenance Time Study

Pragma’s intervention has led to an increase in the number of units completed per day...

Find out more

##### Client Reference | Mining Coal | FI on Pump Maintenance Strategy

Having control over planned and calculated (predictable) replacements of your assets will reduce lost production...

Find out more

##### Case Study | Manufacturing Glass | Nampak Glass | FI on IS Machine Maintenance Strategy

This project forms an integral part of the bigger asset management process by highlighting specific...

Find out more

##### Client Reference | Mining and Minerals | Smelter Plant Asset Reliability Optimisation

The thoroughness of the new maintenance plan eliminated all guessing. Downtime and production throughput were...

Find out more

##### Case Study | OEM Packaging | Sidel | Asset Management Improvement Assessment

Pragma’s consultants assessed the maturity of our organisation in a structured manner. The output was...

Find out more

##### Case Study | Facilities Rental Apartments | Taking control of maintenance with On Key EAM system and Contractor Management

For Ithemba, as a property management company, the main challenge is the return on investment...

Find out more

##### Reference story | Municipal | AM Maturity Assessment

Shift towards optimal mix of reactive to proactive planned maintenance.

Find out more

##### Client Reference | Manufacturing | Real-time Condition Based Monitoring with IIoT

The real-time condition monitoring project brought health measures of critical assets within the client’s plant...

Find out more