---
title: "Case Study"
description: "Assets or components removed from revamped sites are often still fully functional. We are pleased to have received rebates from the replacement"
image: https://www.pragmaworld.net/wp-content/uploads/resources.jpg
canonical: https://www.pragmaworld.net/resource/case-study-oil-gas-retail-sites-fi-generator-life-cycle-management/
url: https://pragma-world.getmd.ai/resource/case-study-oil-gas-retail-sites-fi-generator-life-cycle-management/.md
last_converted: 2026-10-06T17:58:19.647Z
---

# Case Study | Oil and Gas | Retail Sites | FI Generator | Life Cycle Management

November 22, 2017****Assets or components removed from revamped sites are often still fully
functional. We are pleased to have received rebates from the replacement of generators. We encourage Pragma to create rebate, reuse or recycle programmes for decommissioned assets on site.

Download case study

##### More content

##### Client Reference | Manufacturing | Automotive | Implementing On Key to Improve Work Planning and Control

On Key is a cost saver because it allows us to become completely paperless and...

Find out more

##### Case Study | Facilities Rental Apartments | Taking control of maintenance with On Key EAM system and Contractor Management

For Ithemba, as a property management company, the main challenge is the return on investment...

Find out more

##### Client Reference | OEM | Packaging | 3PE | Rapid Response | On Key

It was a big help to get all the maintenance recommendations from the different equipment...

Find out more

##### Client Reference | Manufacturing | Automotive | On Key Work Planning and Control on SAP PM

On Key allows us to plan, schedule and allocate tasks to our artisans based on...

Find out more

##### Case Study | Formex | Manufacturing | Automotive

The results of the air leak survey has triggered an energy management drive within the...

Find out more

##### Mining | Mobile work management

Since the roll-out of the application, it has made it much easier to measure work...

Find out more

##### Client Reference | Mining | Coal | Customisation of Asset Tactics

The outputs of the customisation process included a more accurate budget on renewals or the...

Find out more

##### Case Study | Local Government | Municipality | Maintenance Capacity Planning

Our client fulfils a maintenance support function to all divisions within their organisation. The client...

Find out more

##### Client Reference | Manufacturing | Automotive | Reducing High Failure Rate of CE Equipment

By doing proper analysis of all EC Tools per station it could be determined which...

Find out more

##### Reference story | Automotive | Downtime reduction

The Focused Improvement project at the Marriage Station resulted in a deeper analysis of the...

Find out more