---
title: "Smelter Plant Asset Reliability Optimisation"
description: "A new maintenance plan eliminated guesswork at this smelter plant, making downtime and production throughput instantly measurable to prove value."
image: https://www.pragmaworld.net/wp-content/uploads/resources.jpg
canonical: https://www.pragmaworld.net/resource/client-reference-mining-and-minerals-smelter-plant-asset-reliability-optimisation/
url: https://pragma-world.getmd.ai/resource/client-reference-mining-and-minerals-smelter-plant-asset-reliability-optimisation/.md
last_converted: 2026-10-07T19:17:08.187Z
---

# Client Reference | Mining and Minerals | Smelter Plant Asset Reliability Optimisation

November 14, 2022The thoroughness of the new maintenance plan eliminated all guessing. Downtime and production throughput were instantly measurable to test the value-add of the maintenance plan.

Download case study

##### More content

##### Food and beverage | Downtime reduction

Due to the implementation of the level sensor we can see that the OEE started...

Find out more

##### Case Study | Formex | Manufacturing | Automotive

The results of the air leak survey has triggered an energy management drive within the...

Find out more

##### Case Study | Oil and Gas Retail | Shell | Welcome to Shell Toilet Upgrade Savings

Shell is well known as one of the five major national suppliers of petroleum products....

Find out more

##### Municipality | Fleet Management on SAP® PM

Improved Water and Sanitation Fleet Services management results in improved vehicle availability and reliability.

Find out more

##### Reference story | Retail | Costing Model

One costing model, applied across our 200+ contractors enables us to thoroughly manage/verify invoices.

Find out more

##### Case Study | Local Government | Municipality | Nelson Mandela Bay | AIV |  AMIP | ACC

The Distribution Directorate is responsible for the maintenance of and extensions to the distribution network,...

Find out more

##### Client Reference | Manufacturing | Focused Improvement project addressing high failure rate of equipment

Our client is a leading automotive manufacturer in South Africa. The client embarked on a...

Find out more

##### Case Study | On-line condition Assessment Findings of MV Power System (DRUPPS)

Replacement of the feeder cables and terminations under the Pragma quality assurance processes will ensure...

Find out more

##### Case Study | Facilities Rental Apartments | Taking control of maintenance with On Key EAM system and Contractor Management

For Ithemba, as a property management company, the main challenge is the return on investment...

Find out more

##### Liquid packaging | AM maturity assessment

The Pragma consultants were able to assess the maturity of our organisation in a structured...

Find out more