---
title: "Client Reference"
description: "Having control over planned and calculated (predictable) replacements of your assets will reduce lost production time caused by unnecessary breakdown"
image: https://www.pragmaworld.net/wp-content/uploads/resources.jpg
canonical: https://www.pragmaworld.net/resource/client-reference-mining-coal-fi-pump-maintenance-strategy/
url: https://pragma-world.getmd.ai/resource/client-reference-mining-coal-fi-pump-maintenance-strategy/.md
last_converted: 2026-10-07T21:34:01.400Z
---

# Client Reference | Mining Coal | FI on Pump Maintenance Strategy

November 22, 2017Having control over planned and calculated (predictable) replacements of your assets will reduce lost production time caused by unnecessary breakdown repairs and will also reduce maintenance costs.****

Download case study

##### More content

##### Client Reference | Mining and Minerals Nickel | Reliability Engineering and Training FI

A multi-faceted approach involving facilitated, on-site training courses plus an on-site reliability engineering service, supplemented...

Find out more

##### Client Reference | Facilities | Commercial Property | Pragma Service Request App

On Key Action provided a service request app that did away with system complexities and...

Find out more

##### Case Study | Oil and Gas Fuels Retail | Lowering Carbon Emissions

As part of Shell securing its position as the leading global mobility retailer, they have...

Find out more

##### Quarries | EAM system optimisation

PPC’s and Pragma Africa’s new partnership promises to take Strategy Management and Asset Care to...

Find out more

##### Client Reference | Manufacturing | Automotive | On Key Work Planning and Control on SAP PM

On Key allows us to plan, schedule and allocate tasks to our artisans based on...

Find out more

##### Client Reference | Local Government | Municipality | Fleet Management Service

Our client is a metropolitan municipality in Southern Africa with a Fleet Management and Maintenance...

Find out more

##### Mining | Planning and Scheduling

Introducing the On Key planning and scheduling tool highlighted the amount of unnecessary Work Orders,...

Find out more

##### Reference story | Fast foods | Increase statutory SLA’s

Since the implementation of the initiative, the statutory SLA for work orders completed increased from...

Find out more

##### Case Study | Oil and Gas Retail | Shell | Supplier Savings

The renegotiation of prices is an important part of Pragma’s supply chain responsibilities on the...

Find out more

##### Case Study | Oil and Gas Retail | FMC Digitalisation Process Flow

Shell is a national supplier of petroleum products and have a proud record of presenting...

Find out more