---
title: "Quarries Maintenance Planning & Scheduling Training"
description: "A mining and minerals quarry client used Pragma's blended Maintenance Planning and Scheduling training to help teams share experience and apply new skills."
image: https://www.pragmaworld.net/wp-content/uploads/resources.jpg
canonical: https://www.pragmaworld.net/resource/client-reference-mining-minerals-quarries-maintenance-planning-scheduling-blended-training/
url: https://pragma-world.getmd.ai/resource/client-reference-mining-minerals-quarries-maintenance-planning-scheduling-blended-training/.md
last_converted: 2026-10-07T18:40:50.274Z
---

# Client Reference | Mining and Minerals | Quarries | Maintenance Planning and Scheduling Blended Training

June 10, 2019Contact sessions with the facilitator, an experienced Pragma consultant, allowed teams to regroup, share experiences and further enhance learning and make it directly applicable to their work environment.”

Download case study

##### More content

##### OEM | Tetra Pak | On Key

Pragma, with its expertise and technology in asset and maintenance management, is a key strategic...

Find out more

##### Client Reference | Power Utility | Improved MV Substation Reliability and Safety with CM

Time to enhance our substation maintenance programme, by identifying and using CM technologies that allow...

Find out more

##### Client Reference | Distributed Facilities | Retail | SLA driven performance

Our client is a large supermarket retailer in Africa, operating over 2,500 outlets under 15...

Find out more

##### Case Study | Oil and Gas Retail | FMC Digitalisation Process Flow

Shell is a national supplier of petroleum products and have a proud record of presenting...

Find out more

##### Case Study | OEM Packaging | Sidel | Asset Management Improvement Assessment

Pragma’s consultants assessed the maturity of our organisation in a structured manner. The output was...

Find out more

##### Client Reference | Oil and Gas | Commercial Depots Failure Mode and Effects Analysis

By defining and documenting failure modes across 32 asset types, the client achieved a structured...

Find out more

##### Case Study | Manufacturing | FoodBev | Libstar | Asset Care Academy

The intent was to create a common understanding of maintenance management among all plant engineers...

Find out more

##### Case Study | Mining | Coal | Primary Crusher Tip Bin Blockage

The primary crusher blocked on oversize material and suffered a breakdown that delayed production for...

Find out more

##### Mining | Planning and Scheduling

Introducing the On Key planning and scheduling tool highlighted the amount of unnecessary Work Orders,...

Find out more

##### Client Reference | Distributed Facilities Retail | Value Add and Cost Savings

We would like to see savings on our maintenance bill as well as fewer product...

Find out more