---
title: "Proof of Concept"
description: "We challenged our R&D and FM teams to come up with an intelligent FM solution to improve our FM practices and illustrate our Maintenance 4.0"
image: https://www.pragmaworld.net/wp-content/uploads/resources.jpg
canonical: https://www.pragmaworld.net/resource/proof-concept-facilities-management-smart-building-project/
url: https://pragma-world.getmd.ai/resource/proof-concept-facilities-management-smart-building-project/.md
last_converted: 2026-10-07T19:02:14.588Z
---

# Proof of Concept | Facilities Management | Smart Building project

April 4, 2019We challenged our R&D and FM teams to come up with an intelligent FM solution to improve our FM practices and illustrate our Maintenance 4.0 capabilities. As part of the project, Pragma’s R&D team assisted with the digital transformation of various business processes.

Download case study

##### More content

##### Client Reference | Manufacturing | Focused Improvement project addressing high failure rate of equipment

Our client is a leading automotive manufacturer in South Africa. The client embarked on a...

Find out more

##### Case Study | On-line condition Assessment Findings of MV Power System (DRUPPS)

Replacement of the feeder cables and terminations under the Pragma quality assurance processes will ensure...

Find out more

##### Client Reference | Mining Coal | FI on Pump Belt Drive Maintenance and Basic Conditions

Focused interventions do not necessarily always have to lead to complex solutions where redesign or...

Find out more

##### Client Reference | Mining | Providing a structured, role-based approach to skills development

Our client’s requirement for support with the training and development of their asset management resources...

Find out more

##### Client Reference | Manufacturing | Automotive | Spare Parts ABC Criticality Ranking

Our client now has the right type and amount of spare parts available in the...

Find out more

##### Reference story | Automotive | Downtime reduction

The Focused Improvement project at the Marriage Station resulted in a deeper analysis of the...

Find out more

##### Client Reference | Power Utility | Improved MV Substation Reliability and Safety with CM

Time to enhance our substation maintenance programme, by identifying and using CM technologies that allow...

Find out more

##### Reference story | Water utility | SAP® PM optimisation

Moving from an unused SAP® PM system to a well-engineered asset management aligned system.

Find out more

##### Case Study | Oil and Gas Retail | Shell | Passport Training

Shell is well known as one of the major national suppliers of petroleum products. Shell...

Find out more

##### Client Reference | Facilities | Commercial Property | Pragma Service Request App

On Key Action provided a service request app that did away with system complexities and...

Find out more